Tuesday, December 14, 2010

growing up...



Just two weeks ago I asked Ava if she would like her ears pierced and she shook her head. Her older sisters have had their ears pierced for years but she was adamant against it.

Fast forward to a few days ago when she casually mentioned she would like her ears pierced, her hair "professionally" cut and some red highlights put in. We were eating breakfast at the time and most of us dropped our spoons in disbelief. Where did that come from?

So we went to get her ears pierced this morning. I'll probably take her to get her hair cut at the beauty school ($5.00 yay!) but no highlights right now. That is a never ending expense that I don't think is really necessary for a 12 year old.

It's fun to watch the kids grow up but does make me a little anxious. I'll never get this time back and there is so much for me to teach them. But that's how it's supposed to be I guess.

Wednesday, December 8, 2010

p90x



I'm doing my 3rd round (270th day) of P90X. Grae loves to warm up with me and do some of the moves.

He drew this picture for me and I love it for so many reasons but mainly because my sweet boy thought I would be happy to have it.

(In case you didn't know, it's Tony Horton, the instructor. It even has P90X on the shirt and little muscles on his arms.)

Wednesday, December 1, 2010

more bathroom progress...

I have all of the current tonque and groove primed in the bathroom. Brian is installing the trim but ran out. Another trip to the ReStore is in order.



I'm starting to add some accessories that I've collected because I can't wait. You can see the painting I picked up at Goodwill that was my inspiration for the colors peeking out above the toilet. There will be a aqua colored shelf below it.



Here is that same view months ago:


You can see all the posts about the upstairs bathroom by clicking here.

Saturday, November 27, 2010

painting stripes - girls bedroom

The girls and I worked on finishing their closet this week. We measured out the stripes and taped them off. I first painted the whole closet in some aqua paint I had in the garage. After that was dry, Ava cut in and Maddie painted the white stripes.

I ended up hiding the fire extinguisher behind their clothes in the closet and installing some hooks. The hooks were originally in our bathroom downstairs before we remodeled it.

They really like the look and I think it looks fun as well.

Before:




After:




Now on to the hallway and finishing up the upstairs bathroom.

Linked:




Monday, November 22, 2010

black bathroom?





I'm over the creamy walls in our downtstairs bathroom and want to do something dramatic. I'm thinking of painting above the wainscotting a charcoal black but then I saw this picture and now maybe I'll paint the lower half black?


Source

It would match our floors which have black tile in them.


I don't know, it's not like I don't have other projects to think about around here. :)

Friday, November 19, 2010

stenciling...

This is what Brian and I worked on last night. I've been wanting to do it for awhile and had the stencil but never the motivation. But I told myself I couldn't watch the newest episode of Psych on Hulu until I had it done. Brian graciously agreed to help me.

He held the stencil and I used a foam roller to apply the paint. It went pretty fast. We finished both walls in under 2 hours.

Before:


After:






I started freaking out on the first row and thought maybe the Polar Bear White was too bright but decided to keep going. Now I love it.

I'm thinking I need something on either side of the green frames but I don't know what. Something wood tone.

Please ignore my unfinished table. I'm going to paint the base a light gray and sand down the top and either stain it lighter or a mahogany color.

Linking:



Catch As Catch Can


Thursday, November 18, 2010

2nd bathroom progress

Me: "You have nothing to do? Well I have something you can do..."

So began Maddie and Ava's adventure today in spackling all the tiny nail holes in the upstairs bathroom.





Brian has almost all the tongue and groove put up except for around the built-ins. We also need to install the quarter round moulding where the ceiling meets the wall as there is no room for traditional moulding. Then on to priming and painting the paneling. I'm painting it all Polar Bear White which is a Behr color which I will have color matched in Miller or BM paint. Since there is no natural light up there, it should help to really brighten it up.



Before:



We also need to finish the countertop and I need to sew a skirt to hide the pipes underneath until we decide how to finish off that space. The fabric will soften it up in there and add some color.

I'm going to use Amy Butler's Fresh Poppies as I already had it in my stash and it goes perfectly with the pink paint I used on the mirror. I don't have enough so I'm going to see if I can find some cheap coordinating fabric at Joann's or Goodwill. Cheap is the word around here as we try to finish the bathroom using little to no money.


Here's that same angle a few months ago:




My cute mirror that I painted as it was hanging on the wall. I need to glaze it to tone down the color some. This is one nook we are building in. There are two more underneath.

I'm going to be working on stenciling the dining room and Brian will be working on finishing the built-ins. We hope to have it at least primed by Thanksgiving!

Linking: